High quality, high speed, with ease – this is the Astron hall from Dryvit Profi!
The new gym construction is proceeding according to plan and to the greatest satisfaction of the client, the University of Debrecen. The construction work is fast thanks not only to the skilled workforce but also to the Astron prefabricated steel structure system.
Thanks to the Astron system, there are no cuts, drilling or welding required to be performed on the construction site, all that happen in the prefabrication production hall, so construction on site is easy and fast, making on-site costs and live labour requirements minimal.
As a leading contractor of Astron, Dryvit Profi Kft. can provide a fast, elegant and easy solution for every need. We can deliver anything from a multi-storey car park to a production hall or sports facilities etc.
The structure of the gym is completed within days, in addition, road construction, the construction of the car park and the structural construction of the service building are all in progress.
This is how the new gym will look like:
Design: Keletterv / András Kováts
Project Manager: Judit Miklóssy, István Szép Jr.
Electrical Project Leader: Zoltán Prekopcsák
Engineering Project Leader: Gyula Szakállas
Civil engineering: István Csécsei, Levente Vetési
Steel Division Manager: János Kazai
Construction Manager: Mihály Balla
Electrical Construction Manager: József Kónya