Next stage: renovation of Ebes railway station

Zoltán Kiss

Renovation works of the stations along the Ebes – Püspökladány railway line have been commenced last year, within the confines of the project the railway stations of Ebes, Kaba and Hajdúszoboszló will be renewed.

Dryvit Profi Kft. was assigned to renovate the entrance building, as well as to constuct a new service building, a subway and canopies for the platform in Ebes.

The canopies are already installed, the insulation and the bottom cladding of it is still need to be done.

Regarding the new service building we are performing the finishing works at the moment.

The curiosity of the entrance building is that the MÁV intends to renovate the elevation according to the plans made by its own designer office in 1892, so the altered building will be restored to its original appearance.

General project manager, Zoltán Kiss was asked about the renovation:

„The recovery is being performed in two phases, currently we are at the first phase, creating the lodgings, recovering the roof and the facade, besides we are turning the waiting hall into a new station office.

The control equipment will be installed here.

Then comes the second phase, in which the current station office is going to be turned into a passenger waiting hall.

During that temporary period, while the new waiting hall will be under construction, passenger traffic will take place in temporary containers, but without interruption. ”

Meanwhile, the construction of the subway is going on, soon the tiling work will follow.

Ebes station, construction of entrance building

General project manager: Zoltán Kiss

Site engineer: Csaba Kovács

Electrical project manager: Tamás Pál

Mechanical project manager: Gyula Szakállas

 

Ebes station, construction of service building

General project manager: Attila Koroknai

Site engineer: Csaba Kovács

Electrical project manager: Zoltán Prekopcsák

Mechanical project manager: Gyula Szakállas

 

Ebes station, foundation works of subway and canopy 

General project manager: Attila Koroknai

Site engineer: Csaba Kovács

Electrical project manager: Zoltán Prekopcsák

 

Ebes station, construction of canopies of platform 

General project manager: István Csécsei

Site engineer: Csaba Kovács

Electrical project manager: Zoltan Prekopcsák

Stay Connected!

Follow us on Facebook!

Contact us

We would love to hear from you




H-4030 Debrecen, Karabély utca 3.

+36 52/782-994

+36 52/785-091

Qualification

Based on the qualification of Opten Ltd., our company is one of the most trusted players in business life.

Awards

In 2015 and 2017, we were awarded
a construction Master’s award
in Hajdú-Bihar
County.

In 2017, we were awarded „the economic person of the Year in Debrecen” from our clients, partners and the general public.

Certifications