We are building an in vitro biological laboratory for TEVA Pharmaceuticals
We are building an IN VITRO biological testing laboratory in the Debrecen headquarters of Teva Pharmaceuticals. The term in vitro (“in the bottle”) refers to an experimental technique in which the experimental process does not take place in a living organism but outside it under controlled conditions, in which case the biological activity of biomolecules, typically proteins, will be determined in the laboratory.
The new laboratory is created by remodelling an existing building located on the factory site in a central, high-traffic area. In order not to disturb the manufacturing processes, Dryvit Profi and Teva colleagues work closely together, in accordance with the strict safety, health and safety regulations already used in the pharmaceutical industry. Through the investment, we modernize and renovate the entire building.
Construction is proceeding according to an accelerated schedule, internal finishing work and facade insulation are currently underway, and the building will be handed over in April 2021.
Design: Mikroklíma Tervező Kft.
Project Leader: István Szlávik
Project Preparatory: Dávid Szilágyi
Construction Manager: Mihály Balla
Electrical Project Leader: Lajos Csuka
Engineering Project Leader: Zoltán Katona